Case Studies.
From complex crane lifts to specialist heavy haulage, our case studies show how Buzzard designs and delivers safe, controlled solutions for demanding projects across the UK.
- No Obligation Quotes
- UK-Wide Coverage
- Fully Insured
- Google ★★★★★
TRUSTED BY
Case Studies.
Every project we undertake brings its own challenges, from restricted site access and tight programmes to heavy, high-value loads that demand precise handling. These case studies show how our crane hire, contract lifting and specialist haulage teams work together under one operation, developing practical lifting strategies with clients and delivering safely, efficiently and on schedule, from planning through to placement.
INDUSTRO & ConocoPhillips - Loading Arm lifting.
Working closely with the OEM, we developed a lift plan to safely remove & re-place the jetty arms for the first time since original installation.
North Yorks Council - railway bridge repairs.
Buzzard were engaged to install structural steel beams to the underside of a railway bridge in order for it to continue to be safely utilised.
SIEMAG TECBERG - removal Of HEAVY machinerY.
Buzzard consulted on the removal of the hoist and winding machinery, providing engineering insight on the original installation to enable removal.
px group - engineered Biomass Turbine Bases.
Buzzard were engaged to jack up a 40t turbine base in order to enable the maintenance team to inspect andinstall new anti-vibration pads.
nlighten - data centre chiller removal.
Buzzard were engaged to remove
3no existing cooling chillers and associated pipework as part of the facility upgrading process.
Skeeby Solar Farm - Transformer Installation.
Installation of 8no 22t transformers to a solar farm, working in conjunction with a European courier in a remote location with restricted access.
px group - Heat Exchanger Removal.
Working on a live gas plant supplying London, Buzzard removed two no.6t heat exchangers as part of the scheme of maintenance plan.
Prysmian - Vessel Demobilisation.
Buzzard supplied skilled labour for the demobilsation of a cable laying vessel docked at the AV Dawson facility
at the Port of Middlesbrough.
Talk to us about your next project and see how Buzzard can deliver results for you.
Send us the load, the plot and the window. We’ll come back with a plan and a price.