px Group – Beckton Chip Heat Exchanger Removal.

TRUSTED BY

Contract Lifting.

Scope:
Working on a live gas plant supplying London, Buzzard removed two no.6t heat exchangers as part of the scheme of maintenance plan, all conducted in a manner which ensured the continuation of live site operation. 

Service:
Full contract lifting.

Disciplines:
Appointed person, lift supervisor, slinger/banksman.

Timescale:
All delivered within the customer’s timeframe parameters.

QHSE:
Zero injuries & LTI’s, no environmental issues.

Talk to us about your next project and see how Buzzard can deliver results for you.

Send us the load, the plot and the window. We’ll come back with a plan and a price.

Rising to Challenges, Delivering Solutions.